Structural Steelworks for Organic Rankine Cycle (ORC) and Thermal Oil Heating Plant Steel Buildings


20220805 Organic Rankine Cycle ORC Steel Building With Turbo Generators


The MLTC Bioenergy Centre is a combined heat and power, carbon-neutral, energy system consisting of a 6.6 MW (net) power generation system while also providing process heat for kiln-drying NorSask’s lumber. The facility is fueled by residual woody biomass generated by the NorSask sawmill. The carbon-neutral plant is capable of producing 55,000 mw-hrs per year to the SaskPower grid – enough to power 5,000 homes.


The Design, Engineering, Detailing, Fabrication, Painting, Delivery and Supervision of Installation: Scopes:


  • (1)Organic Rankine Cycle (ORC) Steel Buildings with turbo-generators and all associated fuel handling and environmental emission systems
  • (2) Thermal oil heating plant mounted Air-cooled, refractory-lined, reciprocating grate furnace with thermal oil radiant heat exchangers 
  • (3) Exhaust Steam Air Cooled Condenser (ACC) structures
  • (4) Wood Pellet Waste Piling Storage Shed Building
  • (5) Biomass Wood pellet waste fuel Storage Bin (3-Day Capacity to cover the period of weekend holiday)
  • (6) Fuel Infeed/Outlead Pipe Belt Conveyors and their stack tower and transfer towers (including their related staircase towers)
  • (7) Electrostatic Precipitator (ESP) Building and facilities 
  • (8) Planermill Shavings Cyclone Tower equipped with Metering Bin, Ehouse, Rawlings grinder, Feed conveyor, infeed conveyor,etc
  • (9) Pump Skid, piping skids, emergency cooler skid;
  • (10) Recirculated flue gas ductworkdiversion duct work, thermal insulated Expansion tanks(with shot peen system), combustion chamber houses and casings;
  • (11) Gravity take-up transportation system steel works
  • (12) Cable trays and frameworks 


The installation involves one air-cooled, refractory-lined, reciprocating grate furnace with thermal oil heat exchangers, a 6.6 MW Organic Rankine Cycle (ORC) turbo-generator and all associated fuel handling and environmental emission systems. The bioenergy plant achieves significant environmental benefits by reducing the carbon intensity of the SaskPower grid, reducing the use of natural gas for industrial process heating and completely eliminates adverse particulate matter in air emissions. The bioenergy plant enhances the economic outcomes of the nine Indigenous communities associated with the Meadow Lake Tribal Council through improved operations of Canada’s only 100% Indigenous-owned sawmill by converting a waste stream into valuable energy. The ultimate recipients of the ongoing long term benefits of the bioenergy centre are the Indigenous youth and families of the Meadow Lake Tribal Council located in northwest Saskatchewan.

20211026 first fire ignition heating up plume water vapor refractory line invisible


The photos of the products of site construction and erections:

20211014 ESP power generation building Steelworks Erection Ongoing


The photos of the products ready for shipment in ZHM workshop and at port


20200328 thermal oil heating plant steel columns beams piled at Shanghai port delivery

20200328 thermal oil heating plant steel columns beams piled at Shanghai port delivery


20200328 Curved sections Silo bunkers hoppers packed port break bulk shipment

20200328 Curved sections Silo bunkers hoppers packed port break bulk shipment


20200328 fuel piling sheds steel structures piled at Shanghai port delivery

20200328 fuel piling sheds steel structures piled at Shanghai port delivery


20200328 heating exchange plant plateworks break bulk packed piled at Shanghai port delivery

20200328 heating exchange plant plateworks break bulk packed piled at Shanghai port delivery


20200328 High stength bolts nuts washer fasteners packing wood cases

20200328 High stength bolts nuts washer fasteners packing wood cases


20200328 ORC building steel structure client inspection in workshop

20200328 ORC building steel structure client inspection in workshop


20200328 ORC building steel structure piled at Shanghai port delivery

20200328 ORC building steel structure piled at Shanghai port delivery


20200328 ORC building steel structure piled at Shanghai port delivery inspection

20200328 ORC building steel structure piled at Shanghai port delivery inspection


20200328 ORC building steel structure piled at Shanghai port delivery primary steelworks

20200328 ORC building steel structure piled at Shanghai port delivery primary steelworks


20200328 ORC building steel structure piled at Shanghai port delivery secondary

20200328 ORC building steel structure piled at Shanghai port delivery secondary


20200328 ORC building steel structure piled at Shanghai port delivery secondary steelworks

20200328 ORC building steel structure piled at Shanghai port delivery secondary steelworks


20200328 ORC building steel structure piled at Shanghai port delivery truss supports

20200328 ORC building steel structure piled at Shanghai port delivery truss supports


20200328 ORC building steel structure piled at Shanghai port main steelworks

20200328 ORC building steel structure piled at Shanghai port main steelworks


20200328 ORC building steel structure piled at ZHM workshops

20200328 ORC building steel structure piled at ZHM workshops


20200328 ORC building steel structure transported at Shanghai port delivery

20200328 ORC building steel structure transported at Shanghai port delivery


20200328 Piping spools piled at Shanghai port delivery

20200328 Piping spools piled at Shanghai port delivery


20200328 plateworks hopper steel structure piled at Shanghai port delivery

20200328 plateworks hopper steel structure piled at Shanghai port delivery


20200328 power plant equipment plateworks bulk packed piled at Shanghai port delivery

20200328 power plant equipment plateworks bulk packed piled at Shanghai port delivery


20200328 Surge tank piled at Shanghai port delivery

20200328 Surge tank piled at Shanghai port delivery


20200328 thermal oil heating plant galvanized steel structure piled at Shanghai port delivery

20200328 thermal oil heating plant galvanized steel structure piled at Shanghai port delivery


20200328 thermal oil heating plant pipes ducts piled at Shanghai port delivery

20200328 thermal oil heating plant pipes ducts piled at Shanghai port delivery


20200328 thermal oil heating plant steel angle braces piled at Shanghai port delivery

20200328 thermal oil heating plant steel angle braces piled at Shanghai port delivery


20200328 thermal oil heating plant steel beams piled at Shanghai port delivery

20200328 thermal oil heating plant steel beams piled at Shanghai port delivery


20200328 thermal oil heating plant steel brackets piled at Shanghai port delivery

20200328 thermal oil heating plant steel brackets piled at Shanghai port delivery


20200328 thermal oil heating plant steel columns beams piled at Shanghai port delivery

20200328 thermal oil heating plant steel columns beams piled at Shanghai port delivery


20200328 thermal oil heating plant steel columns piled at Shanghai port delivery

20200328 thermal oil heating plant steel columns piled at Shanghai port delivery


20200328 thermal oil heating plant steel gantry stack piled at Shanghai port delivery

20200328 thermal oil heating plant steel gantry stack piled at Shanghai port delivery


20200328 thermal oil heating plant steel posts piled at Shanghai port delivery

20200328 thermal oil heating plant steel posts piled at Shanghai port delivery


20200328 thermal oil heating plant steel saddles piled at Shanghai port delivery

20200328 thermal oil heating plant steel saddles piled at Shanghai port delivery


20200328 thermal oil heating plant steel structure piled at Shanghai port delivery

20200328 thermal oil heating plant steel structure piled at Shanghai port delivery


20200328 thermal oil heating plant steel structures piled at Shanghai port delivery

20200328 thermal oil heating plant steel structures piled at Shanghai port delivery


20200328 thermal oil heating plant tube bundles break bulk packing ready for shipment

20200328 thermal oil heating plant tube bundles break bulk packing ready for shipment


20200328 thermal oil heating plant steel columns beams piled at Shanghai port delivery

20200328 thermal oil heating plant steel columns beams piled at Shanghai port delivery


20200328 thermal oil heating tube bundles  storages at Shanghai port delivery

20200328 thermal oil heating tube bundles storages at Shanghai port delivery


20200328 turbine generator building steel structure piled at Shanghai port delivery

20200328 turbine generator building steel structure piled at Shanghai port delivery