The Wanda Mall Water Park Steel Structure Project undertook by us was completed with the roof installation, this is a signal of the most difficulty of the whole job completion.
The steel structure for this project is 4500ton, the project construction is very difficult and the consultant has high quality requirement. The tube truss section is 6mx5m with largest span at 91m, the single piece of structure member is 132ton.