印尼Wisma Mulia二期大厦高层钢结构工程
Project Name: Indonesia Jakarta Wisma Mulia Phase II High Rise Building
Lead Time: April.2013 to Sep.2013
Scope of Supply: Engineering, Shop-drawings, Fabrication and Delivery on CIF TANJUNG PRIOK PORT, JAKARTA – basis on INCOTERM 2010
Introduction:The project is the first high-rise building we undertook within Indonesia after several months struggling with other competitors and amicalbly discussion wth client technical/commercial teams. The project is the second phase for Headquarte of Mulia Group,Indonesia. The overall project is totally 40floors. Our main works content includes but is not limited to the raw material procurement (Hot rolled, build-up, HFW), fabrication, NDT test, sand blasting,one layer of 50 Micron Epoxy Zinc Chromate Primer for site fire-proofing coating(2.5hours).