澳大利亚Christmas Creek地区铁矿石加工厂2期厂房
Australia Christmas Creek Stage 2 澳大利亚Christmas Creek地区铁矿石加工厂2期厂房
Australia Christmas Creek Stage 2,This project is in Fremental,Austrial for the Mining Center.
Our fabrication is carrried out as per AS2007-2007,AS/NZS 1554.1:2004 and inspected by SGS inspection companies for 100% of the butt welding and 5% of the fillet welding.
UT had been performed to the welding seam of fabricated structure steel according to testing standard AS2207-2007 Level 2, and welding testing of 100% of the butt welding and 5% of the fillet welding. No defect goes beyond the limit of acceptance critia AS/NZS 1554.1:2004 table 6.2.1.
VT had been performed to 100% of the welding seam according to the acceptance criteria AS/NZS 1554.1:2004 table 6.2.2, the test result is acceptable.