智利Coronel购物中心以及办公楼工程
Project Name: Chile Coronel Shopping Mall&Office Building
Project Tonnage: 235TON
Lead Time: Aug.2013 to Sep.2013
Scope of Supply: Engineering, Shop-drawings, Fabrication and Delivery on FOB Basis,China Port.
Introduction:The Chile Coronel Shopping Mall&Office Building Consist of two main areas, Area A is 3250m2 for office block and Area B is 7200m2 for shopping mall block, total area is around 10500m2 for the commecial developping in Chile.





