Contact Us   
Search   
Your Position: Home > Honor > 2017 Year

Water Treatment Works Process Plant Steel Buildings Costain Lane End

2024-4-9 9:40:19

No Pics.

Introduction
Water Treatment Works Process Plant Steel Buildings Costain Lane End

Following a scheme to improve the low flow of the River, a new 16.3 MI/day Costain water treatment plant was constructed at Lane End in Kent. The project involved the construction of a 'chemical building', which houses chemical dosing plants, and a nitrate removal plant. The chemical building is a steel portal frame with a curved roof, spanning 43m x 12m, and is 4.2m high. The purlins and frames are designed to be able to withstand loads from a 169kg/m cable tray, which is hung from the purlins and rafters.



Water_Treatment_Works_Process_Plant_Buildings_Costain_Lane_End_Overviewe

Water_Treatment_Works_Process_Plant_Buildings_Costain_Lane_End_Overview

Water_Treatment_Works_Process_Plant_Buildings_Costain_Lane_End_chemical_House

Water_Treatment_Works_Process_Plant_Buildings_Costain_Lane_End_chemical_House

Water_Treatment_Works_Process_Plant_Buildings_Costain_Lane_Gutter_Curved_Eave

Water_Treatment_Works_Process_Plant_Buildings_Costain_Lane_Gutter_Curved_Eave

More Pics