    Steel Structures for Power Plant Edra Energy,Malaysia

    2024/5/13      view:

    Steel Structures for Power Plant Edra Energy,Malaysia 


    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_1_edra-melacca-power-plant-1024x572


    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_2_-Power-Plant-Main-Combined-cycle

    Descriptions of Steel Structures for Power Plant Edra Energy,Malaysia :

    1.Owner:Edra Energy Sdn Bhd
    2.Location: State of Malacca
    3.Description:The third unit of what is now the largest combined cycle gas turbine power plant in Southeast Asia
    4.Project’s EPCC (engineering, procurement, construction and commissioning) lead: Hyundai Engineering 
    5.Power train Facilities: General Electric GE,USA,  including gas turbines, steam turbines, heat recovery steam generators and generators
    6.Gas Turbine technology: General Electric GE 9HA.02 Gas Turbine( 50Hz, four-stage gas turbine, featuring a double-wall casing, solidified blades, and an aerodynamic hot gas path), an STF-D650 steam turbine, a W88 generator, and a Once Through Heat Recovery Steam Generator (OT HRSG)  Efficiency of more than 60% in electricity production
    7. Potential Scale: The plant, with generation capacity of more than 2.2 GW in total, is the largest combined cycle gas turbine facility in Southeast Asia. Source: GE Power
    8.Project output:19.6 billion kWh of electricity annually, supplying about 12% of the total power demand in Peninsular Malaysia for at least the next 20-plus years.
    9.Advance technology:The GE H-class gas turbines are air-cooled, have high efficiency and are cost-effective in converting fuel into electricity. The 50Hz gas turbine can generate up to 680MW with 63.7% net efficiency.
    9.Mechanical and Piping services: Jurong Engineering,Singapore
    10.Lateral gas line:Petroliam Nasional (PETRONAS)
    11.Steel Structure Design, Engineering, Fabrication, Delivery and Installation: Zhejiang Huawu Steel Structure Engineering Co.,Ltd. (ZHM)

    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_3_Main_Steelworks


    Scopes of our Steel Structures for Power Plant Edra Energy,Malaysia 


    In the range of power plants, including the main plant (centralized control building, steam engine room, oxygen room, coal bin, etc.), boiler steel structure, flue gas desulfurization denitrification steel structure, air-cooled steel structure, coal convey structure etc.

    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_4_Main_Steel_Frame_Work

    Advantages of ZHM in work of Steel Structures for Power Plant Edra Energy,Malaysia 


    We have much  experience in power plant steel structure modeling and  in processing,  can provide on-site guidance for the installation etc after-sales service.


    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_4_Main_Steel_Frame_Work


    We are qualified supplier of Belgian Hamon, Beijing , Beijing Shouhang to Yanchang , the oil group , energy and chemical-owned power plant , air-cooled steel structure project is under construction.


      Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_6_boiler_steel_structure_Erection


    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_7_Control_Building


    Steel_Structures_for_Power_Plant_Edra_Energy_Malaysia_8_Transport_To_Site


    Would you like to see more images of ZHM’s Metal Steel Structures for Power Plant  ? Visit our Photo Gallery.


    HOW CAN WE HELP YOU?


    ZHM’s world-class team — together with our raw material suppliers and subcontractors — works to solve your most challenging design, engineering, farbrication or construction issues.

    Contact ZHM by telephone at +86 135-8815-1981 or send us your questions via email to info@zhmsteelworks.com