Contact Us   
Search   
Your Position: Home > News > Activities

Container Terminals Reefer Rack Steel Structure Solutions

2024/4/24      view:

Container Terminals Reefer Rack Steel Structure Solutions


"ZHM COMES UP WITH A SUITABLE SOLUTION, WHETHER IT IS A MODULAR REEFER RACK OR A CUSTOMIZED SOLUTION!”


We advise, design, supply and if required, we install products to connect reefer containers. ZHM Steel Construction supplies these products to container terminals all over the world. Our product range consists of reefer racks, reefer safety tunnels and high-mast lightings.

The objective of a reefer rack is to provide stacked reefer containers (refrigerated containers) with power in a safe and easy way. A reefer rack can be built up in various ways. Depending on your logistics plan and the infrastructure on site, we map out your wishes and make a suitable design.

Furthermore, we have developed a modular reefer rack concept which has a flexible lay-out, is dismantable and can easily be extended. This means that the design you have chosen can grow with your business or can be moved to another site.

ADVANTAGES MODULAR REEFER RACK:

• Safe
• Sustainable
• Flexible lay-out
• Dismantable
• Prefab
• Short construction time
• Easy assembly
• CE-marking

OPTIONS:
• Roof
• Façade (e.g.: safety screen for stack crane)
• Waiting room for drivers
• Doors

Container_Terminals_Reefer_Rack_Steel_Structure_Solutions_01_Reefer_Racks_Elevation_Views


OUR PRODUCTS

REEFER SAFETY TUNNEL

The objective of a reefer safety tunnel is to provide safe access to the reefer racks. In this way, personnel of the container terminal does not have to cross the stacking area, where unsafe situations may occur. Our reefer safety tunnels are containers which have been adjusted into tunnel elements. By connecting these tunnel elements, a safe passage for your personnel is created. The tunnels have been designed in such a way that your reefer containers can be simply placed on top.

Container_Terminals_Reefer_Rack_Steel_Structure_Solutions_02_Reefer_Racks_Safety_Tunnels



HIGH-MAST LIGHTING

A steel lattice mast with ladder and platform for the assembly of devices. The high-mast lighting is a three-sided lattice, conically shaped and made in sections of six metres. At the masthead, a square platform is provided. Additional line protection at 50 centimetres from the gratings. On the inside of the mast a ladder is provided, which runs as fall arrester.

Container_Terminals_Reefer_Rack_Steel_Structure_Solutions_03_High_Mast_Lighting_Frames


OUR SERVICE

PROJECTS

We do of course carry out the projects we take on with the greatest possible care, entirely under our own management. We draw up a customised action plan for every project in order to identify opportunities for optimisation and any potential risks. We set up the build processes as efficiently as possible. This results in a project to a high-quality standard delivered within the agreed schedule. The project manager responsible conducts the entire process and involves the right staff and knowhow. We coordinate all processes from design up to and including completion seamlessly with one another.

EXPORT, DELIVERY AND TRANSPORT

You can also decide to carry out assembly works yourself. ZHM Steel Construction produces and supplies reefer racks to third parties all over the world. Many reefer racks are shipped from our production site on a yearly basis. In order to deliver them as efficiently as possible, we also offer transport solutions both for inland and ocean freight. We cooperate closely with international transport companies and ship our products in containers, by open or tilt transport.

Container_Terminals_Reefer_Rack_Steel_Structure_Solutions_04_Reefer_Racks_Transportation


SUPERVISION

In case you will assemble the reefer racks yourself, we think it is important you do this as efficiently as possible. That is why we offer the possibility to have one of our supervisors on site, who will support you during the assembly works.


Container_Terminals_Reefer_Rack_Steel_Structure_Solutions_05_Reefer_Racks_Installation_Supervision


refrigerated_container_racks_reefer_racks_Steel_Structure_China_04_Antwerp_Reefer Rack_Steel_Frame Construction 

Photo 4:ZHM Steel Installation Report of Belgium Antwerp Reefer Rack Steel Structure Project(CE Certified,Eurocode), April,2024