Introduction
Steel Bypass Tunnel Access chambers For Rondout Tunnel Project, New York, USA

ZHM Huawu Steel was awarded the supply 2 sets of access chambers for the construction of Rondout west branch bypass tunnel in USA. The access chambers are manufactured in accordance with ASME Section VIII – Rules for Construction of Pressure Vessel.

Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_00_Delaware-Aqueduct-bypass-route-illustration


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_01_Delaware-Aqueduct-bypass-route-illustration


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_02_Trnsit-part-section-view


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_03_access-pipe-cap-deck-steel-wire-rope


Originally placed into service in 1944, the Rondout-West-Branch Tunnel (RWB) is a section of the Delaware Aqueduct, which supplies nearly 60% of the water for New York City. The aqueduct also is the primary source of water for several upstate communities.

The 13.5-foot-diameter (4.1 m) rock RWB Tunnel is approximately 45 miles (72 km) long, ranges in depth from 300 to 2,300 feet (91–701 m), and operates with an internal head of up to 1,200 feet (366 m). It was constructed during the late 1930s and 1940s using drill-and-blast methods. Most of the tunnel has an un-reinforced concrete liner. In areas of poor ground conditions and significant groundwater inflow during construction, steel “interliners” were incorporated in the lining system.

Since about 1970, leakage has been observed at the ground surface, especially in an area immediately west of the Hudson River near Roseton, New York. The geology in this area of the alignment is complex. The depth, from ground surface to the existing tunnel at the Hudson River, ranges from 600 to 900 feet (183–274 m).


Rondout-West Branch Tunnel (RWBT) is currently leaking between 15 and 35 million gallons per day. DEP plans to address the leaks in RWBT by undertaking the RWBT repair program, which consists of:

  • Constructing a bypass tunnel around the leaking areas in Roseton.
  • Repair of Aqueduct in Wawarsing.
  • Developing water supply augmentation projects.

ZHM Huawu Steel was awarded the supply 2 sets of access chambers for the construction of Rondout west branch bypass tunnel in USA.

The access chambers are manufactured in accordance with ASME Section VIII – Rules for Construction of Pressure Vessel.

Each set of access chambers consist of the following components:

  • Shaft cap with flange
  • Transition fitting with flange
  • Access pipe with flange
  • Other accessories (stud & nut, O-ring, and plug for telltale hole)

Fabrication Photos

Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_04_shaft-cap-flange


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_05_access-duct-main-body


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_06_Inspection


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_07_shaft-cap-machining


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_08_shaft-cap-machining


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_09_shaft-cap-machining


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_10_shaft-cap-butt-welding-NDT


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_11_shaft-cap-flange-trial-bolting-fastenning


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_12_tunnel-duct-butt-welding-longitudinal



Blasting and Painting

Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_13_shaft-cap-blasting-SA3


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_14_blasting-roughness-testing


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_15_shot-blasting-result-inspection


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_16_Conical-part-painting


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_17_conical-part-painting-inspection


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_18_tunnel-duct-painting


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_19_shaft-cap-painting-thickness-testing



Packing & Shipping
Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_20_break-bulk-ship-loading-on-board


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_21_break-bulk-ship-loading-on-board


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_22_break-bulk-ship-fixing-cargo


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_23_break-bulk-ship-accessories-loading


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_24_break-bulk-ship-main-body-loading


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_25_break-bulk-ship-barge-to-terminal


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_26_transport-to-port


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_27_break-bulk-ship-main-body-loading


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_28_break-bulk-accessories-wood-carton


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_29_break-bulk-ship-loading-on-board


Steel_Access_chambers_For_Rondout_Tunnel_Project_New_York_USA_30_transport-to-port


Mare Harbour Steel Dolphin Pipes - Falkland Islands

ZHM Huawu Steel fabricated and supplied 13 steel mono piles to Edgen Murray Europe. The project was part of the Mare Harbour base improvements in the Falkland Islands. Each steel mooring dolphin pile included fender mounting brackets and stiffeners, bollard supporting plates and topside deck plates.


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_0_Site-Installation


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_1_Workshop-Production


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_2_Barge_Port_Delivery


The focus of the upgrade works was to improve the existing facility to allow the berthing of Roll-On and Roll-Off resupply ships. Annually the facility would see approximately 10 berths which resupplies the base with food suppliers, hardware, infrastructure and commercial freight.

ZHM Huawu Steel in conjunction with their regional agent Edgen Murray Europe supplied the mono-piles used as the mooring and breasting dolphins. Each pile was nearly 2.5 metres in diameter and lengths between 19.5m up to 34.8m per piece. The dolphin pile design incorporated a mounting flange for a cone fender system that weighed in excess of 15 metric tons that was each capable of absorbing over 300 ton metres with over 250 tons reaction force. Each dolphin consisted of the steel pile and an upper section bolted on to the top of the steel pile via internal flanges for the bollard and walkway deck mounting.

The service environment as classified under BS EN ISO 12944-2 was Category C5-M – Offshore Environments which is a very high marine atmospheric corrosivity category in regions with high salinity. The selected corrosion protection system for the steel dolphin mono-piles utilized a 380 microns dry film thickness approved coating.

Prior to production, ZHM Huawu Steel completed a comprehensive Inspection & Test Plan (ITP) with a breakdown of all the processes which included: welder qualification review, raw material inspection, component dimensional inspection, weld inspection and coating inspection. Strategic review, witness and certify hold points were incorporated for each of the stages. A 3rd party inspector was selected for the project as well by ZHM Huawu Steel and accepted by the client. After several iterations working with both the project client and consultant, the ITP was agreed and approved well before production started.

The production was completed successfully and was loaded to be shipped to the Falkland Islands in May 2017.

Fabrication Photos

Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_3_Fabrication_Photos


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_4_Enclosed_Chamber_welding


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_5_Butt-Welding


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_6_Submerged_Arc_Welding


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_7_Stiffener_Fin_Plate_welding


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_8_Cap-ring-welding



Mono Piles Loading Photos
Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_9_Mono_piles_vessel_loading


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_10_Mono_piles_vessel_loading


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_11_Mono_piles_vessel_loading


Mare_Harbour_Steel_Dolphin_Pipes _Falkland_Islands_12_Mono_piles_vessel_loading


Why ZHM Huawu Steel Steel Bypass Tunnel Access chambers ?


Reliable_and_customized_DesignsG
Cutting_edge_designing_process
Free_online_Pricing_System
Easy_Bolt-by-number_Assembly
Reliable and Customized Designs Cutting Edge Designing Process Free Online Price System Easy Bolt-by-number Assembly
Over_two_decades_of_Experiencey
Value_Engineering_for_Money
Unmatched_In_Quality
Excellent_Customer_Service
Over Two Decades of Experience Value For Money Unmatched in Quality and Craftmanship Excellent Customer Service

Would you like to see more information and images of ZHM’s Metal Steel Structure Steel Bypass Tunnel Access chambers ? Visit our Photo Gallery.

HOW CAN WE HELP YOU?

ZHM’s world-class team — together with our raw material suppliers and subcontractors — works to solve your most challenging design, engineering, farbrication or construction issues.

Contact ZHM by telephone at +86 135-8815-1981 (wechat and whatsapp) or send us your questions via email to info@zhmsteelworks.com

More Products