Contact Us   
Search   
Your Position: Home > Honor > 2017 Year

Prefabricated Steel Buildings for Textile Sewing Plant Workshop in Mauritius

2024-4-9 14:59:30

No Pics.

Introduction
Prefabricated Steel Buildings for Textile Sewing Plant Workshop in Mauritius

Our client's vast project of expansion led to the construction of a new 'usine de confection' (nothing to do with confectionery, but meaning 'finishing' or make-up). It is the principal production centre for CMT in Mauritius, measuring 750,000 square feet, and employing over 2500 people. Two lengths of 54m long cyclone resistant ridge ventilation were installed into the textile factory to ensure the comfort and safety of workers. Interestingly, We also created several overhanging toilet 'pods' which were suspended on the exterior wall of the building, saving valuable space inside the factory and keeping the toilets out of the working areas.


Prefabricated_Steel_Buildings_for_Textile_Sewing_Plant_Workshop_in_Mauritius_01


Prefabricated_Steel_Buildings_for_Textile_Sewing_Plant_Workshop_in_Mauritius_02


Prefabricated_Steel_Buildings_for_Textile_Sewing_Plant_Workshop_in_Mauritius_03

(several overhanging toilet 'pods' which were suspended on the exterior wall of the building, saving valuable space inside the factory and keeping the toilets out of the working areas.)

More Pics