Steel Structure Gantry Reefer Rack Moved in Port of Newark, NJ
Rigging/Heavy Hauling
Newark, NJ / September 2012
We rigged and moved this 10’ x 365’ Reefer Rack at the Port of Newark in September 2012. We cross-braced the 27’ tall and 200 ton Reefer Rack with chains and loaded it onto 9 Buckingham Dollies. Once lifted up off of the ground, the Buckingham Power Dolly System with SmartSteer carried the rack smoothly around a corner and down to its new location. The move only took several hours and the entire process was completed in less than a week.
Specs
27’ tall and weighed 200 ton
Moved on 9 Buckingham Dollies
Note: This Article regarding a special movable kind of reefer rack, is summarized from :"Reefer Rack Moved in Port of Newark, NJ"
(https://www.wolfehousebuildingmovers.com/project/reefer-rack-moved-in-port-of-newark-nj/)
Would you like to see more information and images of ZHM Huawu Steel's own reefer rack products and projects ? Visit our Photo Gallery.
HOW CAN WE HELP YOU?
ZHM’s world-class team — together with our raw material suppliers and subcontractors — works to solve your most challenging design, engineering, farbrication or construction issues.
Contact ZHM by telephone at +86 135-8815-1981 (wechat and whatsapp) or send us your questions via email to info@zhmsteelworks.com
- Pre:None
- Next:Pre-Engineered Buildings vs Co 2024/6/9