Installation Report of Belgium Antwerp Reefer Rack Steel Structure Project(CE Certified,Eurocode)

2024/3/16      view:

Project Name: Belgium Antwerp Reefer Rack Steel Structure Project(CE Certified,Eurocode)

Period: Jun,2023-Jan,2024

Location: Antwerp,Belgium

Project Installation undergoing: 22nos of 5storey refrigerated container Reefer Racks, including material supply, fabrication and delivery under CFR Antwerp,Belgium of steel structures, stairs, ladders, serrated grating floor panels, wire meshes, cable trays, handrails, walkways, control panels, distribution boards, electrical brackets, canopies,reefer tunnels, reefer access passage, additional factory trial assembly etc.  approx. 1000ton


On March 16, 2024, the ongoing work of Installation and Erection of 22nos of 5storey refrigerated container Reefer Racks, including material supply, fabrication and delivery under CFR Antwerp,Belgium of steel structures.











Member/Item

Standard

Grade

Galvanized

Columns

BS/EN HEB200

S355JR

EN 1461

Primary Beams

BS/EN HEB200/IPE220/IPE160

S355JR

EN 1461

Secondary Beams/Stingers

IPE160

S355JR

EN 1461

Handrail pipes

CHS48x5

S235JR

EN 1461

Handrail sleeves

CHS48x5

S235JR

EN 1461

Kick plates

PL100x6

S235JR

EN 1461

Bracings

Equal Angle L50

S235JR 

EN 1461

Grating

Serrated PL32

S235JR

EN 1461

Stair treads

Serrated PL32

S235JR

EN 1461

Plates

PL5-PL30

S355JR 

EN 1461

Anchor bolts columns

EN/DIN 976/4032

Gr.8.8

BS/EN 10684


Nuts

BS/EN ISO 4032

Gr.8

BS/EN 10684



Factory Production and Factory Trial Assem Photos As shown below (Nov.2023:


Below picture is the Belgium Antwerp reefer rack site general photo:



Below picture is the site general layout:

Below picture is 3D isometric view of 5-storey reefer rack structures(Type 1 and Type 2):

Below picture is SGS inspector factory inspection/sample cutting of raw materials HEB200/IPE220/plates as per Eurocode standards:

Below picture is main column/beam frame factory welding/assembly:

Below picture is galvanized reefer rack beams:

Below picture is Belgium client inspector's production/welding inspection work (CWI: Certified welding inspector):

Below picture is Belgium client inspector's finished products inspection as per BS/EN 1461.

Below picture is factory column packings on stack:


Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory overall steelwork packings for reefer racks:

Below picture is factory container loading work for steelwork packings for reefer racks:

Below picture is factory container loading work for steelwork packings for reefer racks:

Below picture is factory container loading work for steelwork packings for reefer racks:

Below picture is partical erected steel reefer rack structures: