Contact Us   
Search   
Your Position: Home > Support > Service Center

The installation of Wall Panel

2024/4/20      view:

The installation of Wall Panel


Home » Steel Building » specification » The installation of Wall Panel

The step of wall panel installation, which is applicable to guide the construction process of on-site, the installation of sandwich wall panels. The correct construction process and safety measures, combined with this installation step and construction drawings, it can ensure the project at the lowest cost and the fastest speed.


The_installation_of_Wall_Panel_1_Wall-Panel-Installation-1



Wall Panel Installation

Before installing the sandwich wall panel, and related edge trimming accessories, please read this installation procedure and install drawing carefully to ensure a smooth installation.

The_installation_of_Wall_Panel_2_Wall-Panel


Wall Panel Installation


The_installation_of_Wall_Panel_3_Sandwich-Panel


PU Sandwich Panel


The sandwich panel can divide into polyurethane sandwich panel (PU / PIR), rock wool sandwich panel, and glass wool sandwich panel according to the different core materials.

1. Stack up

The_installation_of_Wall_Panel_4_sandwich-panel-Stack-up


Wall Panel Stack up


A. The storage location must be flat, reliable, clean, and ventilated. The storage yard should be as close as possible to the area where the outer wall panel installation to avoid secondary transportation over a long distance.

B. When stacking, pay attention to adjust the height with sleepers, so that the wall panels after the stacking have an inclination angle of 2 ~ 5 ° C, so that even if water enters between the outer wall panels, water will not stay on the exterior wall panels. If it places outdoors, it must completely cover with the waterproof cloth. The exposed part of the core material at the end of the wall panel with rock wool or glass wool as the core material should strengthen to prevent the core material from being damaged by rain.

C. The stacking ground of the exterior wall panel. It should far away from other bare steels. It prevents the rustable materials on these steels from falling and adhering to the external wall panel. It is difficult to remove and cause rust spots and penetrate the steel plates.

D. When the outer wall panels are stacked, each stack cannot exceed two boxes. Do not place heavy objects and step on the exterior wall panels to avoid damaging the finish or even the steel plate.

E. Tens of thousands of sandwich wall panels wrapped with polyethylene protective film. The film cannot expose to direct sunlight for a long time. Otherwise, it will make it difficult to peel off the protective film.

F. The edges must also be neatly stacked. If placed outdoors, they must completely cover with tarps.


2.Handling

The_installation_of_Wall_Panel_5_Handling-of-panel


sandwich panel handling


Protective gloves and goggles must use during manual handling. For a single exterior wall panel, depending on the length of the board, it needs to be carried by 3 ~ 5 people, so as not to deform the outer wall panel. To prevent damage to the interface, do not use the interface as a stress point to pick up the tablet. Do not drag the exterior wall panels on the surface of the object during the transportation, and do not pull the exterior wall panels to each other, so as not to damage the finish. Avoid bending when handling, the bending will break the core material of the board and deform the inner and outer surface forever.

3.Lifting

The_installation_of_Wall_Panel_6_wall-panel-lifting


sandwich panel lifting


Bundles of external wall panels can not be lifted directly by forming a triangle between the hooks and the outer wall panels. Instead, the lifting equipment and booms provided with the project must use to vertically suspend the slings between the external wall panels and the increases. It should find after lifting the balance point. To single-bundle crane, handle it carefully and do not tow the exterior wall panel.


Wall Panel Installation


1. Installation preparation

A. Handover inspection: Check that the installation of purlins can not meet the installation conditions of the envelope structure, including the deviation of the alignment line of the purlins, the verticality, the height of the bending vector, and the structural requirements of the installation.

B. Material preparation: Detailed check the specifications, model, quantity, and specifications and quantity of wall plates corresponding to the layout drawings.

C. Machine preparation: lifting equipment, portable tools, power connection equipment, scaffolding, and other temporary small accessories.

D. Technical preparation: detailed construction drawings, layout drawings, node structure drawings, etc.

E. Preparation of the site and temporary facilities: loading and unloading conditions, equipment walking route, lengthened position, horse way setting, construction road, temporary setting.

Before construction, there should be specialized detailed drawing staff to provide a technical explanation to construction technicians to ensure the smooth progress of development and the guarantee of project quality.

2.Base Trim Installation

The_installation_of_Wall_Panel_7_Base-Trim-1


Base Trim Installation


According to the construction details, determine the installation is starting line elevation, laying, leveling, and installation of the starting bracket. The deviation of the installation of the bracket is ± 2mm in and out, and the lower height deviation is ± 2mm

3.Wall Panel Installation

Wall Panel Installation


The_installation_of_Wall_Panel_8_wall-panel-installation


The_installation_of_Wall_Panel_10_base-trim-2-430x1024


Base Trim


A. Study the construction drawings carefully, choose the installation facade according to the construction drawings, and determine the installation benchmark.

B. According to the number of the construction drawing board, install and adjust the starting plate; the starting bracket fixes the bottom (side) of the starting plate, and the level of the leveling compound board measured at the end of the installation. The scale of the composite board with a level ruler at the end of the facility, the installation accuracy of the measurement board is ± 2mm. When it confirmed that the installation accuracy fully meets the installation tolerances, the self-tapping nails use to fix the external wall panel in the same structure;

C. The installation tolerance must be measured and adjusted for every five rows of external wall panels installed;

D. Cut the external wall panels on the spot at the doors and windows, openings, and the yin and yang corners of the building.

E. Don’t forget to remove the polyethylene protective film on the surface after the board installed.

F. The board between adjacent columns should be checked for straightness of the seam and adjusted in time to avoid misalignment.

4.Installation of the wall corner panel


The wall corner panel installed after the wall panel installed, or it erects first. The installation method is the same as that of the wall panel. At the same time, the corner panel corresponds to the verticality of the panel seams and the joints of the two wall panels.

5. Installation of various trim


The closed edge corresponds to the use position noted in the construction details. For those that need secondary processing, the corners or folds should cut in advance. It protects the cutting edge. The overlap of trim: Due to the length, the trim needs to overlap, To protect the trimming coating, it is best to cut with scissors.

Overlap: Due to the length, part of the overlay needs to overlap. When there is a waterproof requirement for water flooding outside the wall, the overlap length is 150mm, and two rivets connect the distance between 50 ~ 100mm; For 50mm, use a rivet to fix the range of 50 ~ 100mm.

A. The installation of Base Trim


The_installation_of_Wall_Panel_11_base-trims


Base Trim installation


B. The Installation of Window Trim

The_installation_of_Wall_Panel_12_window-trim


Wall Panel Installation


The_installation_of_Wall_Panel_13_window-trim1



Wall Panel Installation

The_installation_of_Wall_Panel_14_window-trim-1-594x1024



Window Trim


C.The installation of the door trim

The_installation_of_Wall_Panel_15_door-trim


The_installation_of_Wall_Panel_16_wall-corner


Wall Panel Installation


D.Wall Corner Installation

Wall Corner 


Wall Corner Trim


Wall Corner 

Base Trim installation


B. The Installation of Window Trim

Wall Panel Installation

Wall Panel Installation


Window Trim


C.The installation of the door trim

Wall Panel Installation


D.Wall Corner Installation


The_installation_of_Wall_Panel_16_wall-corner
Wall Corner 

The_installation_of_Wall_Panel_17_wall-corner-trim-1
Wall Corner Trim

The_installation_of_Wall_Panel_18_wall-corner-1-538x1024
Wall Corner