Your Position: Home > News > Industry News

Jiangyin Intercity Rail Station Transit Tripod Lattice Truss Steel Structure Project

2024/2/19      view:

Project Name: Jiangyin Intercity Rail Station Transit Tripod Lattice Truss Steel Structure Project


Location: Wuxi, Jiangsu Province


Curtain Wall Types: Point-Supported Glass Curtain Wall, Framed Glass Curtain Wall, Aluminum Panel Curtain Wall, Stone Curtain Wall, and Aluminum Alloy Rain Louvers


Project Overview: The project, with a total length of 30.4 km, will start from Jiangyin Riverside and end at Yange Bridge Station of Wuxi Huishan District Metro Line 1. It includes nine stations and will connect with Wuxi Metro Line 1 upon completion, effectively establishing a "Half-hour Commuting Circle" between Wuxi and Jiangyin, promoting integrated development. The main termianl Jiangyin building area is 42000sqm with 4 platforms and 10 lines.


The Jiangyin Railway Terminal Roof steel structure truss covers a total area of 24,500sqm with 1708ton steel structure, including 9156 pieces of steel members and 163 sets of steel trusses and lattice girders. 









Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 

Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 

Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 

Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 

Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 

Module Preassembly on Ground before Overall Lifting within 5hours up to 19.740m Height Level.


Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 

Railway Station Jiangyin Terminal Main Roof Frame Structure Under Construction 







(Large span tripod truss frame structure workshop preassembly/pre-assembly)