Case   
Contact Us   
Search   
Your Position: Home > Case > Case2

New Air Traffic TWR Control Tower Steel Structures, Australia

2024-6-12 16:19:10

No Pics.

Introduction

New Air Traffic TWR Control Tower Steel Structures, Australia


ZHM Huawu Steel was contracted by one of its regional partners in Australia to produce 100 metric tons of pre-engineered structural steel for a new air traffic control tower to be used for the RAAF Base Amberley, Australia


New_Air_Traffice_TWR_Control_Tower_Australia_02-control-tower-under-erection


This project is part of the Air 5431 Facilities Project of which ZHM Huawu Steel's scope of work is for the new air traffic control tower. The steel tower structure is a 25 metre height multi-level facility that is designed to accomodate a control cabin, external observation desk, crew rest area, restroom, kitchenette and a mechanical plant room. This new tower will replace the existing tower, after it has been commissioned for use.

New_Air_Traffice_TWR_Control_Tower_Australia_01-Control-tower-BIM-3D-Model-Drawing


The main project standard for the steel pre-engineering building structure was Australian Standard AS 4100 for materials, construction, fabrication and erection. The welds also required different extents of visual, radiographic and magnetic particle inspection as per AS 1554.1. The steel grades used for the sections and plates varied between Grade 250 and Grade 300. 

Prior to production, ZHM Huawu Steel completed a comprehensive Inspection & Test Plan (ITP) with a breakdown of all the processes which included: welder qualification review, raw material inspection, component dimensional inspection, weld inspection and coating inspection. Strategic review, witness and certify hold points were incorporated for each of the stages. A 3rd party inspector SGS was selected for the project as well by ZHM Huawu Steel and accepted by the client. After several iterations working with both the project client and consultant, the ITP was agreed and approved well before production started.

ZHM Huawu Steel successfully completed the full steel fabrication in September 2017. 


New_Air_Traffice_TWR_Control_Tower_Australia_03-steel structure-under-production


Why ZHM Huawu Steel pre-engineered New Air Traffice Control Tower Steel Structures ?


Reliable_and_customized_DesignsG
Cutting_edge_designing_process
Free_online_Pricing_System
Easy_Bolt-by-number_Assembly
Reliable and Customized Designs Cutting Edge Designing Process Free Online Price System Easy Bolt-by-number Assembly
Over_two_decades_of_Experiencey
Value_Engineering_for_Money
Unmatched_In_Quality
Excellent_Customer_Service
Over Two Decades of Experience Value For Money Unmatched in Quality and Craftmanship Excellent Customer Service

Would you like to see more information and images of ZHM’s Metal Steel Structure New Air Traffice Control Tower? Visit our Photo Gallery.

HOW CAN WE HELP YOU?

ZHM’s world-class team — together with our raw material suppliers and subcontractors — works to solve your most challenging design, engineering, farbrication or construction issues.

Contact ZHM by telephone at +86 135-8815-1981 (wechat and whatsapp) or send us your questions via email to info@zhmsteelworks.com

More Pics