The process of steel warehouse buildings installation
The process of steel warehouse buildings installation
Table of Contents
1.The process of steel warehouse buildings installation:
1.1.Installation Sequence of Metal Structures
1.2.Installation Sequence of Wall and Roof Panel
1.3.The quality control of steel warehouse building installation:
The process of steel warehouse buildings installation:
steel warehouse buildings installation
2.Erection of the steel frame: The steel frame of the building is constructed and bolted together on site.
3.Attaching panels: The steel panels, which serve as the walls and roof of the building, are attached to the frame.
4.Installing doors and windows: The required doors and windows are cut out of the panels and installed.
5.Adding insulation: Insulation is installed in the walls and roof to provide thermal protection.
6.Finishing: The interior and exterior surfaces of the building are finished, typically with drywall and paint, respectively.
7.Utility installation: Plumbing, electrical, and HVAC systems are installed as required.
This process may vary depending on the size, design, and complexity of the installed steel warehouse building, but the above steps provide a general overview.
Steel Warehouse Building Installation
Installation Sequence of Metal Structures
1. Hoisting of Primary Structure: Assembling roof beams on the ground, erecting steel columns, hoisting steel beams, connecting secondary structure, correcting primary structure deviations, installing crane beams, and mezzanine structure (optional).
Assembling roof beams
erecting steel columns
steel warehouse buildings installation
Installation Sequence of Wall and Roof Panel
1. Roof panel and insulation cotton installation: Install insulation cotton first, then install the roof panel (lay wire mesh under the insulation cotton to prevent the insulation cotton from falling off)
Roof Panel Installation
2. Wall panel installation: It is mainly wall insulation and wall panel installation.
Wall Panel installation
3. Trim and flashing installation: Gabe trims between the roof and wall, wall corner trim at the corner of the wall, the base trim between the wall panel and brick wall, the door and window trim, and so on.
During the construction of the prefab steel warehouse buildings, as long as the installation completed in strict accordance with the construction process and corresponding procedures, so it can effectively avoid engineering problems caused by operating errors and speed up the progress of the project.
The quality control of steel warehouse building installation:
2. For the installation of steel columns, check whether the shim under the column baseplate is solid and flat to prevent the anchor bolts under the baseplate from becoming unstable.
3. Whether the steel column is vertical and there is no displacement, during the installation process, before the structure has not formed a stable system, temporary support measures should take.
4. When the steel structure installed to create a space fixed unit, and after passing the acceptance check, the construction unit required to promptly pour the scope of the column bottom plate and the top surface of the foundation with expanded concrete.
5. Check the verticality and overall plane bending of the main structure of the steel warehouse building.
- Pre:None
- Next:Industrial Steel Workshop Buil 2024/4/16