Contact Us   
Search   
Your Position: Home > News > Company News

The steel structure of the public bonded warehouse project for daily duty-free goods in Hainan is capped

2024/3/28      view:
The steel structure of the public bonded warehouse project for daily duty-free goods in Hainan is capped
 
The project covers an area of 99.4 mu, with a total construction area of about 69,000 square meters and a total investment of 350 million yuan. Our company has undertaken the deepening, processing and production of 2865 tons of steel structures.

The main contents include two 2-story logistics warehouses. The warehouses are connected by overhead platforms. Container trucks can directly go up to the second-floor overhead platform to load and unload goods through the truck ramp.

In addition to completing the construction according to the nodes, the project department also strictly abides by the quality standards, adopts new technologies and new processes, and strives to create high-quality projects. The project adopts a total of 19 new technologies including 7 major items and 19 minor items including high-strength steel bar application technology, concrete crack control technology, and high-performance door and window technology to ensure the safety performance of the project after it is put into use.

After the steel structure of the project was capped, the prototype gradually emerged. After the project is completed, it will provide bonded warehousing services for daily duty-free goods, where enterprises can enjoy preferential policies such as tax deferred and financial services for imported goods. It has become a warehouse and distribution center for duty-free goods.