Steel Tug Harbour Pontoon,Port Hedland,Australia | Made In China ZHM

2024-6-14 9:04:57

No Pics.

Introduction
Steel Tug Harbour Pontoon,Port Hedland,Australia | Made In China ZHM

ZHM Huawu Steel alongside Australian local general contractor constructed 2 new tug harbour pontoons between 31 metres to 44 metres in length. The scope of work also included gangway platforms.


Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_01 Pontoon 2 halves Joined Connection in open working yard of factory

Pontoon 2 halves Joined Connection in open working yard of factory


An EPC contract worth nearly US$100 million for a  new tug harbour at Hunt point, Port Hedland in Australia was awarded to Lendlease in July 2015 by BHP Billiton. Another scope of work related was for the upgrade to the exiting tug harbour at Nelson point. The project was to be undertaken by BHP Billiton. A fleet of ZHM Huawu Steel-capable tug boats were to be accommodated which would operate within the inner harbour and Port Hedland Channel. This fleet would be intended to greatly reduce the risks of channel blockage and vessel grounding. 

ZHM Huawu Steel alongside its Australian partner were awarded the scope of work for the fabrication of 4 large pontoons and 4 gangways.

The size of each pontoon was between 33 and 52 metres in length and it was fabricated in 2 halves initially inside. Only at the last stage were the 2 halves joined.

ZHM Huawu Steel also fabricated and/or fitted other components such as: removable handrails, cathodic protection anodes and bollards.

The pontoons, gangways and other components successfully arrived in Australia in November 2016.


Part I: Steel Pontoon Fabrication


Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_02 Pontoon Large and Heavy Fabricated Components flanged nozzles

Pontoon Large and Heavy Fabricated Components flanged nozzles

Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_03 Pontoon Fabrication Underway going

Pontoon Fabrication Underway going

Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_03

Pontoon Fabrication Underway going

Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_04 Pontoon Fabrication Underway going

Pontoon Fabrication Underway going

Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_05  Pontoon Completed 1

Pontoon Completed 1

Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_06  Pontoon Completed 1

Pontoon Completed 1

Steel_Tug_Harbour_Pontoon_Port_Hedland_Australia_07 A small clearance required careful handling and lifting of the pontoons into position without damage

A small clearance required careful handling and lifting of the pontoons into position without damage

Tug Harbour Pontoon Australia ready to be shipped

Tug Harbour Pontoon Australia ready to be shipped

Tug Harbour Pontoon Australia ready to be shipped

Tug Harbour Pontoon Australia ready to be shipped

Loading of the Pontoons happened well into the night

Loading of the Pontoons happened well into the night

The pontoons were lifted with 2 cranes were lifted at the fabrication facility using 2 cranes

The pontoons were lifted with 2 cranes were lifted at the fabrication facility using 2 cranes

Loading of the 52 metre length pontoon

Loading of the 52 metre length pontoon

Gangways, 33 metre pontoons and other components secured

Gangways, 33 metre pontoons and other components secured

Loading of the 52 metre length pontoon on to the vessel

Loading of the 52 metre length pontoon on to the vessel


Part II: Gangway Fabrication

Gangway Production and Pre-assembly in workshop

Gangway Production and Pre-assembly in workshop

Gangway site inspection in workshop

Gangway site inspection in workshop

Gangway spray painted in workshop

Gangway spray painted in workshop

Gangway spray painted in workshop

Gangway spray painted in workshop

Gangway spray painted in workshop

Gangway spray painted in workshop

Gangway move out of workshop

Gangway move out of workshop

Gangway under inspection ready for shipment

Gangway under inspection ready for shipment

Gangway under erection at site

Gangway under erection at site

Gangway under erection at site

Gangway under erection at site


Part III: Other Components


Iron Cast Bollards

Iron Cast Bollards

Full set of components labelled and safely secured under board of vessel for shipment

Full set of components labelled and safely secured under board of vessel for shipment

Handrails and Walkways with Anti Slip Serrated Grating

Handrails and Walkways with Anti Slip Serrated Grating

Mating Flange Sections with blind flange cover read for shipment

Mating Flange Sections with blind flange cover read for shipment

Custom size Hydraulic Cylinders and other accessories loaded into the open top 40feet containers ready for shipment

Custom size Hydraulic Cylinders and other accessories loaded into the open top 40feet containers ready for shipment

Pontoon fabrication Labelling Name Plate

Pontoon fabrication Labelling Name Plate

Why ZHM Huawu Steel Tug Harbour Pontoon ?


Reliable_and_customized_DesignsG
Cutting_edge_designing_process
Free_online_Pricing_System
Easy_Bolt-by-number_Assembly
Reliable and Customized Designs Cutting Edge Designing Process Free Online Price System Easy Bolt-by-number Assembly
Over_two_decades_of_Experiencey
Value_Engineering_for_Money
Unmatched_In_Quality
Excellent_Customer_Service
Over Two Decades of Experience Value For Money Unmatched in Quality and Craftmanship Excellent Customer Service

Would you like to see more information and images of ZHM’s Metal Steel Structure Tug Harbour Pontoon? Visit our Photo Gallery.

HOW CAN WE HELP YOU?

ZHM’s world-class team — together with our raw material suppliers and subcontractors — works to solve your most challenging design, engineering, farbrication or construction issues.

Contact ZHM by telephone at +86 135-8815-1981 (wechat and whatsapp) or send us your questions via email to info@zhmsteelworks.com

More Pics